The White House Historical Association / Home
The White House Historical Association / Classroom
graphic detail
White House History / Navigation WHHA / Museum Shop WHHA Home WHHA / White House Christmas Ornament WHHA / White House History WHHA / The Classroom WHHA / Publications WHHA / Press Room WHHA / About Us WHHA / Museum Shop WHHA Home WHHA / White House Christmas Ornament WHHA / White House History WHHA / The Classroom WHHA / Publications WHHA / Press Room WHHA / About Us
graphic detail
graphic detail
Picturing the President's House : HARRY S. TRUMAN
 
graphic detail

Title: Construction on the White House

Description: Gutted to the outside stone walls, deepened with a new two story basement, reinforced with concrete and 660 tons of steel, and fireproofed, the White House was stabilized. The protection of the historic stone walls was so important that workers dismantled a bulldozer and reassembled it inside to avoid cutting a larger doorway out of the walls. Shafts out of windows carried out debris from the inside of the house, and external stairs were built because the inside was completely empty during the renovation.

Date: April 12, 1950

Creator: Abbie Rowe, National Park Service

Credit: Harry S. Truman Library




Return to "Picturing the President's House" MAIN PAGE

The White House Historical Association | Classroom
graphic detail
 
graphic detail
graphic detail
White House Historical Association
graphic detail
graphic detail